NO CARBON TRANSPORT, POWER PLANT 120 PPM

NO  CARBON  TRANSPORT, POWER PLANT 120 PPM
GHGe 120 ppm

Friday, January 19, 2018

NO CARBON TRANSPORT, POWER PLANT

Andy No Carbon Transport, Power Plant. No Engine, No Fuel, No GHGe, No Heat. Automotive, Rail, Ship, Jet, Missile, Rocket. Electrical, Mechanical Power Plant. Will never catch Fire as “ No Fuel “. Catapult Free Renewable Energy, 24/365. 1.23 mn lbs/sft WaterJet from 6000 m Water depth. 6000 t/sqm, 600 kg/sqcm, 600 atm. Contained in water pressure vessel for use at NTP in atmos. Low cost, high speed, low fare, low operation- Maintenance, high return, high ROI % Transport Power CBM = hp*hr/22 m3 Weight : 1.2*CBM Ton. Fare 1 C/km Low cost, low operation maintenance, high Return, low PPA, high ROI % in Power Plant. Power Plant Power CBM = 64*MW*hr m3 Weight : 1.3*CBM Ton. PPA 3 C/kwh Fuel saved : 15 mn t / day Oil, Gas and 15 mn t / day Coal, costing 11,400 bn$/yr. Parts saved : 3,000 bn$/yr. Net:14,400 bn$/yr. CER = 25 bnt/yr. [ 70 %], GHGe reduction. Global Emission : 120 ppm from 400 ppm. INV:120 bn$.Return: 500%. Pat: 200% in 4 yrs Atlantic, Indian, Pacific Oceans. 4 Units each. Arabian Sea, Bay of Bengal. 5 bn$ each. Tech Demo: 1 mn$ for Automotive 2 yrs; 15 mn$ for Ship, Jet, Missile. 1 T each

No comments:

Post a Comment