Wednesday, August 29, 2018
Thursday, April 26, 2018
NO CARBON TRANSPORT, POWER PLANT 120 PPM
Voiture du Futur: Diesel : Bosch annonce une rupture qui pourrait to...: Alors que le salon de Pékin bat son plein et que tout le monde trouve formidable la Chine qui est si "moderne" en prenant le vir...
No Carbon Transport, Power Plant No Engine, No Fuel, No GHGe, No Heat. Saves 14 Mnt/Day Oil, Gas;14 Mnt/Day Coal, Lignite Costing 11,400 Bn$/Yr. Saves 3000 Bn$/Yr by Parts CER= 25 Bnt/Yr. GHGe=400*(1-25/36)= 120 ppm Inv. 120 Bn$. Pat 240 Bn$/Yr in 4 Yrs |
Friday, January 19, 2018
NO CARBON SHIPPING 330, 660 knot








NO CARBON TRANSPORT, POWER PLANT
Andy No Carbon Transport, Power Plant.
No Engine, No Fuel, No GHGe, No Heat.
Automotive, Rail, Ship, Jet, Missile, Rocket.
Electrical, Mechanical Power Plant.
Will never catch Fire as “ No Fuel “.
Catapult Free Renewable Energy, 24/365.
1.23 mn lbs/sft WaterJet from 6000 m Water depth.
6000 t/sqm, 600 kg/sqcm, 600 atm. Contained in
water pressure vessel for use at NTP in atmos.
Low cost, high speed, low fare, low operation-
Maintenance, high return, high ROI %
Transport Power CBM = hp*hr/22 m3
Weight : 1.2*CBM Ton. Fare 1 C/km
Low cost, low operation maintenance, high
Return, low PPA, high ROI % in Power Plant.
Power Plant Power CBM = 64*MW*hr m3
Weight : 1.3*CBM Ton. PPA 3 C/kwh
Fuel saved : 15 mn t / day Oil, Gas and
15 mn t / day Coal, costing 11,400 bn$/yr.
Parts saved : 3,000 bn$/yr. Net:14,400 bn$/yr.
CER = 25 bnt/yr. [ 70 %], GHGe reduction.
Global Emission : 120 ppm from 400 ppm.
INV:120 bn$.Return: 500%. Pat: 200% in 4 yrs
Atlantic, Indian, Pacific Oceans. 4 Units each.
Arabian Sea, Bay of Bengal. 5 bn$ each.
Tech Demo: 1 mn$ for Automotive 2 yrs;
15 mn$ for Ship, Jet, Missile. 1 T each
















Thursday, January 18, 2018
MULLAI PERIYAR DAM
MULLAI PERIYAR DAM TRAGEDY IN 1978 IS "MADE BY MALAYALEES" CM, SE, EE, AEE, AE, DAM SUPT, LUSKERS, BOAT DRIVERS. ON FATE FULL DATE WATER WAS ALLOWED TO GO UPTO +152.50 ft "" PENNY QUICK STOOD "" BEYOND FRL +152 ft BY NOT OPENING SHUTTRS BY MALAYALEES AEE, AE, DAM SUPT( NAGARKOIL CHRISTIAN NADAR) DEVA DOSS TO BREAK DAMS-MAIN, BABY DAM, SHUTTERS. SUPPOSED TO OPEN AT +150 ft. SUDDENLY WATER LEVEL WAS BROUGHT DOWN TO +142.50 ft BY DOSS. WHY?. WHO HAS POWER ? ON THE DATE OF AGREEMENT, December, 1978 , WATER LEVEL WAS +142.50 ft. WONDERFUL SC HAS EXCAVATED +142 ft FACT IN 20 YRS. SC VERDICT IS POOPOOED BY KERALA. IGNORED BY SC, GOVT AT DELHI. FINAL IS PENDING FROM 1978 TO TILL DATE. 2017-1978= 39 Yrs LOSS TO HUMAN DRINKING WATER, CATTLE, IRRIGATION, FOOD. CHALLENGE IS PENDING PAST 5 YRS WITH KERALA, TO Dr Sindhu Joy Santimon. DO NOT GULP THIS . PUBLISH. ELSE SUED IN SC ANDY APPAN, M.E, EE (R) PWD, CUMBUM. THENI dt E MAIL : MUTHU.ANDY.APPAN@GMAIL.COM |
MULLAI PERIYAR DAM
MULLAI PERIYAR DAM TRAGEDY IN 1978 IS "MADE BY MALAYALEES"
CM, SE, EE, AEE, AE, DAM SUPT, LUSKERS, BOAT DRIVERS.
ON FATE FULL DATE WATER WAS ALLOWED TO GO UPTO +152.50 ft "" PENNY QUICK STOOD "" BEYOND FRL +152 ft BY NOT OPENING SHUTTRS BY MALAYALEES AEE, AE, DAM SUPT( NAGARKOIL CHRISTIAN NADAR) DEVA DOSS TO BREAK DAMS-MAIN, BABY DAM, SHUTTERS.
SUPPOSED TO OPEN AT +150 ft.
SUDDENLY WATER LEVEL WAS BROUGHT DOWN TO +142.50 ft BY DOSS.
WHY?. WHO HAS POWER ?
ON THE DATE OF AGREEMENT, December, 1978 , WATER LEVEL WAS +142.50 ft. WONDERFUL SC HAS EXCAVATED +142 ft FACT IN 20 YRS.
SC VERDICT IS POOPOOED BY KERALA. IGNORED BY SC, GOVT AT DELHI.
FINAL IS PENDING FROM 1978 TO TILL DATE. 2017-1978= 39 Yrs
LOSS TO HUMAN DRINKING WATER, CATTLE, IRRIGATION, FOOD.
CHALLENGE IS PENDING PAST 5 YRS WITH KERALA,
TO Dr Sindhu Joy Santimon. DO NOT GULP THIS . PUBLISH. ELSE SUED IN SC
ANDY APPAN, M.E, EE (R) PWD, CUMBUM. THENI dt
E MAIL : MUTHU.ANDY.APPAN@GMAIL.COM
Subscribe to:
Comments (Atom)


















