NO CARBON TRANSPORT, POWER PLANT 120 PPM

NO  CARBON  TRANSPORT, POWER PLANT 120 PPM
GHGe 120 ppm

Tuesday, November 7, 2017

OPEN CAST MINING - DESERT SAND: THAR DESERT SAND 3600 for 16,000 IN CHENNAI

OPEN CAST MINING - DESERT SAND: GHGe 120 PPM. NO GHG EMISSION TRANSPORT, POWER P...: Andreas Zeller's Blog: Twelve tips on how to prepare an ERC grant proposa... : In 2011, I have been lucky to obtain an ERC Advanced Gran...

Thar Desert-
Sindu River :
60 m wide mud, soil, sand, clay, water track in Gujarat and Rajasthan
upto Thar desert will be the pathway for ship’s travel. 4000/cft
Sand selling rate INR 1500/ton to 2000/ton. Sand cost INR 100/t
Sand can be moved by 200t trailer on road to New Delhi area.
Waste sand from thermal power plant may also be utilised.
Loamy, Fertile Soil, Sand in River Mouth Delta mined to Deposit at Sand
Mined Area for Plantation. Empty return trip can be utilised.


50,000 ton potable water can be transported to Rajasthan, stored.

GHGe 120 PPM. NO GHG EMISSION TRANSPORT, POWER PLANT

Andreas Zeller's Blog: Twelve tips on how to prepare an ERC grant proposa...: In 2011, I have been lucky to obtain an ERC Advanced Grant. The European Research Council (ERC) is a EU institution that promotes high qua...


 Climate Change. 120
ppm
Global GHG Emission 36 BnT/yr.
Catapult Energy reduces it to 11 BnT/yr.  30 %
Hence No Climate Change. 
CER : 69.44 %
GHG Emission down  from  400 ppm 
to 120 ppm
Stops Solar, Wind, Coal, Oil, Gas, Nuke,Geothermal.
Alternate Renewable Energy : 
No GHGe .24/365
Catapult Energy: 1.23 mn lbs/sft THRUST
Automotive, Rail, Ship, Jet, 
Missile, Rocket, P.Plant
No Engine, No Fuel, No GHGe, No Heat
Transport, CBM = HP*Hr/22 m3
Power Plant, CBM = 64*Hr*MW m3
Saves 14,410 Bn$/yr by 
Parts, Fuel. 

INV  100 mn$ get back 200 mn$ in 2 yrs
INV 1000
mn$ get back 2000 mn$ in 3 yrs
INV 120
bn$.ROI=500%.PAT=240bn$/yr in 4 yrs
12 plants at
Atlantic, Indian, Pacific Oceans
Muthukal Andy
Appan, M.E, 50 yrs Expert, India.